Extension of a private school in Trachwni, Limassol. The aim of the project was to design atmospheric spaces for the students and the teachers in order the students to feel closer to nature. So, the decision was to use the CLT walls not only as a construction material but as well as a material for interior design.
The method of the CLT construction was a really fast method so the project completed in just five weeks.